Q-2, r. 35.5 - Regulation respecting landfill methane reclamation and destruction projects eligible for the issuance of offset credits

Full text
44. The promoter may entrust the verification of a project report to a verification organization in accordance with section 43 if the organization, the verifier designated by that organization to conduct the verification and the other members of the verification team
(1)  have not acted for the promoter, in the 3 preceding years, as a consultant for the purpose of developing the project or calculating the GHG emission reductions attributable to the project;
(2)  have not verified project reports covering more than six consecutive reporting periods for the project being verified.
In addition, when the promoter wishes to have the project report verified by a verification organization that has not verified the report for the preceding reporting period, that verification organization, the verifier designated by that organization to conduct the verification and the other members of the verification team, must not have verified a project report covering the three preceding reporting periods for that project.
M.O. 2021-06-11, s. 44.
In force: 2021-07-15
44. The promoter may entrust the verification of a project report to a verification organization in accordance with section 43 if the organization, the verifier designated by that organization to conduct the verification and the other members of the verification team
(1)  have not acted for the promoter, in the 3 preceding years, as a consultant for the purpose of developing the project or calculating the GHG emission reductions attributable to the project;
(2)  have not verified project reports covering more than six consecutive reporting periods for the project being verified.
In addition, when the promoter wishes to have the project report verified by a verification organization that has not verified the report for the preceding reporting period, that verification organization, the verifier designated by that organization to conduct the verification and the other members of the verification team, must not have verified a project report covering the three preceding reporting periods for that project.
M.O. 2021-06-11, s. 44.